Country: Republic of Ghana
Client: JICA(Japan International Cooperation Agency)
Period: November 2020 to Now
Outline:
This is a follow-up project to the road rehabilitation and Asin Praso Bridge replacement between Asin Praso and Bekwai (59.9 km), which was completed in December 2013.
A database was created to integrate the 3D model of the Asin Praso bridge, design drawings and record data for the repairs so that they can be managed centrally.