The Project For Capacity Development For the Realization Of the Urban Transport Master Plan In Kinshasa City / PDTK

Country: Democratic Republic of the Congo

Client: JICA (Japan International Cooperation Agency)

Period: September 2021 to Now

 

Outline:

In Kinshasa, the dysfunctional urban transport system is a bottleneck for economic and social activities, and many people do not have access to safe and affordable means of transport, among other challenges. To address these issues, the city provided support for the formulation of an urban transport master plan in 2018. In this project, technical cooperation is provided for the implementation and implementation of urban transport policies based on the formulated master plan. 

Joint coordination meeting for implementation of activities (JCC, 10 August 2023)
Joint coordination meeting for implementation of activities (JCC, 10 August 2023)
Test painting of road marking materials before implementation of the pilot project by counterparts (11 Aug 2023)
Test painting of road marking materials before implementation of the pilot project by counterparts (11 Aug 2023)

 Preparations the day before the pilot project implementation (17 August 2023)
Preparations the day before the pilot project implementation (17 August 2023)
Road safety awareness classes for local students (18 Aug 2023)
Road safety awareness classes for local students (18 Aug 2023)
Local students' design selected in a competition and pedestrian crossing painted by students (University premises, 18 Aug 2023)
Local students' design selected in a competition and pedestrian crossing painted by students (University premises, 18 Aug 2023)